网站首页
词典首页
请输入您要查询的英文单词:
单词
dehydrated
释义
☞ dehydratedehydratedsee ⇨ thirsty 1 de·hy·drat·ed /di`haɪdretɪd; ˌdiːhaɪˈdreɪtɪd/adjill or weak because you do not have enough water in your body [人体]脱水的[造成不适或虚弱]
随便看
notation
notational
notationist
notations
not available
not-bad
not bad
not be able to do sth
not be accustomed to
not be allowed to do sth
not be a patch on
not be around
not be as young as you were
not be averse to
not be cut out for
not be equipped/be ill-equipped
not be familiar with/be unfamiliar with
not be good enough
not be happy/be unhappy
not be here
not be hungry
not be in a position to do sth/be in no position to do sth
not be in shape/be out of shape/be out of condition
not be interested
not be in the same league/can't compare with
r2022090410004752
r2022090410004754
r2022090410004755
r2022090410004757
r2022090410004758
r2022090410004760
r2022090410004762
r2022090410004763
r2022090410004764
r2022090410004766
r2022090410004767
r2022090410004769
r2022090410004770
r2022090410004772
r2022090410004773
r2022090410004774
r2022090410004775
r2022090410004776
r2022090410004777
r2022090410004779
r2022090410004780
r2022090410004781
r2022090410004783
r2022090410004784
r2022090410004785
核电站海生物拦截体系的探索与实践
试论智慧工地系统建设
BIM技术在某办公楼施工过程中的应用研究
掌中食堂
入侵报警系统在安防领域的应用
无底柱分段崩落法在地下铁矿中的应用
基于大数据平台的盾构集群远程监控与智能决策支持系统及应用
浅析城市燃气输配管网现状及优化研究
GPS-RTK技术在水利工程造价结算审核中的应用
GOOSE报文在变电站自动化验收中辅助定位错误信息的应用
水域综合工程物探方法应用探讨
高原高寒地区对装备作战试验的影响研究
关于现行规范单肢圆形实心钢管混凝土柱轴压承载力计算的比较
浅析快捷键程序在CASS软件中的应用
基于混合遗传禁忌算法的预制构件调度研究
精益工具在装配车间的应用
基于HFACS-AHP的航电试验机飞行试验人因分析
高速公路路桥过渡段路基病害的综合防治措施
建筑给排水工程施工质量问题及解决措施
生态建筑观在建筑设计中的应用
高速公路机电工程车辆检测器安装工艺浅析
复杂条件下大型钢箱梁分段安装技术研究
钻孔灌注桩常见问题的探讨
基于岩土工程深基坑支护技术的实践分析
轨道交通地下二层岛式车站主体工程造价指标体系构建与分析
英汉双解词典收录171353条英汉汉英双解翻译词条,基本涵盖了全部常用单词的读音、翻译及用法,是英语学习的有利工具。
Copyright © 2004-2024 Puapp.net All Rights Reserved
京ICP备2021023879号
更新时间:2026/11/29 12:40:43